← All runs

Sample5_aes.png

draft done r_20261030_220626_a45d · 2026-10-30 22:06:26 UTC

any one of 9 parts failing cuts the supply: none of them has a backupRedundancy: none

DRAFT, not reviewed. No reference was checked and no study spec was given: the agent chose the scope, boundary and what can fail itself (see Assumptions). Have an engineer review it before use.