← All runs

Sample6_selinc.png

draft done r_20261030_221455_0d7e · 2026-10-30 22:14:55 UTC

any one of 5 parts failing cuts the supply: none of them has a backupRedundancy: none

DRAFT, not reviewed. No reference was checked and no study spec was given: the agent chose the scope, boundary and what can fail itself (see Assumptions). Have an engineer review it before use.