← All runs

Sample11_pat-ds50.png

draft done r_20261031_191811_5f38 · 2026-10-31 19:18:11 UTC

any one of 5 parts failing cuts the supply: none of them has a backupRedundancy: none

DRAFT, not reviewed. No reference was checked and no study spec was given: the agent chose the scope, boundary and what can fail itself (see Assumptions). Have an engineer review it before use.